Photo Tianjiao, housing a lot of problems

 Week 6 to Tianjiao went and saw a lot of details and I hope everyone unite to protect their homeland hope developers will pay attention to the problem, success depends on details! 1. Sewer pipe layout is not very reasonable. On future serious impact of renovation (93,81,85,118) 2. elevator and indoor, switches, lamp holders, the installation process is extremely poor and (basically including all units) 3. balcony doors and windows, the plumbing, pipe work in place, Some buried beyond the wall plane, a more serious problem (93,85,118) 4. lampholder switch within the installation, do not meet the requirements, simple materials stolen more serious work (11, 12, 14) 5. wall elevation plane and uneven, and some cracks in the wall units have begun to appear (93,81,85,Bailey UGG boots,118) Note: Figures in parentheses refer to the day after the issue to see more housing (square) units